ALFRED MERRITT SMITH WATER TREATMENT PLANT
Alfred Merritt Smith Water Treatment Plant
The owner issued a contract to a general contractor for the installation of a large ozonation facility at an existing 600 MGD facility.
After commencing work, the contractor alleged that the plans and specifications were inadequate. A claim was filed for delay and disruption based on this alleged defective design.
Systech were retained by the engineer to defend the engineer and owner against the contractors claim.
| Value: | $36,100,000 |
| Region: | Americas |
| Country: | USA |
| Sector: | Industrial and Process |
| Contract: | Undisclosed |