ALFRED MERRITT SMITH WATER TREATMENT PLANT

Alfred Merritt Smith Water Treatment Plant

The owner issued a contract to a general contractor for the installation of a large ozonation facility at an existing 600 MGD facility.

After commencing work, the contractor alleged that the plans and specifications were inadequate. A claim was filed for delay and disruption based on this alleged defective design.

Systech were retained by the engineer to defend the engineer and owner against the contractors claim.

Value: $36,100,000
Region:Americas
Country:USA
Sector:Industrial and Process
Contract:Undisclosed
Alfred Merritt Smith Water Treatment Plant