Systech was retained by the General Contractor who experienced dramatic increases in material costs, and impacts from incomplete design errors.
Systech evaluated the impact of the design changes on the contractor and its electrical subcontractor. Systech also developed an expert report which evaluated the extent of the design problems in terms of delay and disruption costs. The matter settled out of court.
| Value: | $27,000,000 |
| Region: | Americas |
| Country: | USA |
| Sector: | Industrial and Process |
| Contract: | Undisclosed |