Doha Metro
The Doha Metro went into operation in 2019 and forms an integral part of the Qatar rail network. Capable of reaching speeds of up to 100km/h, it will be one of the fastest driverless transport systems in the world.
We have a profound understanding of the requirements that lead to the successful delivery of projects through the design, integration, interfaces, construction, testing and commissioning phases.
The Doha Metro went into operation in 2019 and forms an integral part of the Qatar rail network. Capable of reaching speeds of up to 100km/h, it will be one of the fastest driverless transport systems in the world.
The Réseau Express Métropolitain (REM) is a major public transit project currently under construction in Montreal, which will be one of the largest automated transportation systems in the world. The project initially comprised a 67 km light rail transit system with 27 stations in and around the Greater Montreal area, linking downtown Montreal, South Shore, West Island, North Shore and the airport with a new integrated network. It has subsequently been extended, adding 32 km of track and 23 new stations that will connect the eastern districts with the downtown area.
Kusile and Medupi combined will be the largest dry-cooled power stations in the world, each having an output of 6 x 800MW.
The State of Victoria’s largest road project that will deliver the missing link in Melbourne’s freeway network, connecting the M80 with an upgraded Eastern Freeway. It will cut travel times for the 135,000 vehicles a day using the freeway, remove trucks from local roads and create new walking and cycling paths.
The LRT is a key part of Sydney’s Long Term Transport Master Plan and will significantly improve access from the city centre to the major sporting, university, hospital and entertainment facilities in the south eastern suburbs.
The replacement of the existing US 181 Harbor Bridge and reconstruction of associated expressways, with three lanes in each direction. Once complete, the new Harbor Bridge will be the longest, cable-stay, concrete-segmental bridge in the USA and Canada.
Systech has been working with Metrolinx since 2018, providing multidisciplinary contract management, scheduling, claims avoidance/management, dispute resolution and training services over the full lifespan of projects within its regional capital program.
Systech is supporting an international EPC contractor by providing claim management services, including managing delay and quantum claims as well as rebuttals of subcontractors’ claims.
Systech prepared detailed claim submissions to the project manager in respect of requests for extension of time and additional payment of prolongation and custom duty refunds.
Systech’s role included contract negotiations, variation accounting, administration of subcontracts, payment applications, planning and progress reporting.
The project is the expansion of the São Paulo Metro, Line 6. We have a number of contract management responsibilities including contractual advices, payments, measurement criteria, claims, counter claims, contract escalation, notices, risk management and progress reporting.
クシレとメドゥピを合わせると、世界最大の空冷式発電所となり、それぞれが6基×800MWの出力を持ちます。
ベトナムのホーチミン市メトロは現在建設中で、総延長100kmを超える複数の路線で構成されています。
このプロジェクトは、燃料油、蒸気ドレン、海水を淡水、蒸気圧、電力に変換する蒸気発生装置および海水淡水化装置で構成されていました。
統合ガス化複合サイクル発電所であるヌオン・マグナムは、ヌオン社によって建設されました。この発電所は、オランダ・フローニンゲン州のエームスハーヴェンに位置しています。
このプロジェクトは、サンパウロ・メトロ6号線の拡張です。私たちは、契約上の助言、支払い、計測基準、クレームと反クレーム、契約エスカレーション、通知、リスク管理、進捗報告など、多くの契約管理業務を担っています。